Canva is great for design. Lapis is built for ads.

Canva helps you design anything. Lapis generates high-converting ad campaigns from a text description, optimized for every platform.

Create your first ad
Lapis generating on-brand ads for the Canva comparison

Lapis

Generate ads that convert

Lapis is purpose-built for ad campaigns. Describe what you're promoting, and AI generates complete, on-brand ad creatives optimized for Meta, Google, LinkedIn, and more.

  • AI generates ads from text prompts
  • Auto-sized for every ad platform
  • Performance forecasts before you spend

Canva

General design tool

Canva is a general-purpose design tool. Presentations, social posts, logos, flyers, resumes. You drag, drop, and customize templates to create visual content for any purpose.

  • Drag-and-drop visual editor
  • Thousands of templates
  • Good for non-ad design work

Trusted by 1,500+ marketing teams including

What Canva can't do for your ads

Lapis isn't a design tool. It's an ad engine. Here's what that means.

Generate, don't design feature illustration

Generate, don't design

In Canva, you start with a blank template. In Lapis, you describe your campaign and AI creates complete ad creatives automatically.

Generate ad creative
Built-in audience targeting feature illustration

Built-in audience targeting

Canva designs for everyone. Lapis generates ads tailored to your specific customer personas with messaging that resonates.

Create audience personas
Auto-sized, not manually resized feature illustration

Auto-sized, not manually resized

In Canva, you duplicate and resize for each platform. Lapis generates ads already formatted for Meta, Google, Reddit, and LinkedIn.

Explore supported ad platforms
Performance forecasts feature illustration

Performance forecasts

Canva can't tell you if your ad will work. Lapis forecasts impressions, clicks, and leads before you spend a rupee.

Try ad performance forecasts
Endless variations in one click feature illustration

Endless variations in one click

In Canva, every variant is manual work. In Lapis, click "Create more like this" to instantly generate dozens of options.

Create ad variations
Ads in any language feature illustration

Ads in any language

Canva doesn't translate your ads. Lapis generates the same campaign in English, Hindi, and 15+ languages automatically.

Create multilingual ads

Feature comparison

Canva is a design tool. Lapis is built specifically for ads. The features reflect that.

Lapis

Canva

Included: AI ad generation from text
Not included: AI ad generation from text
Included: Brand-consistent output
Included: Brand-consistent output
Included: Multi-platform auto-sizing
Not included: Multi-platform auto-sizing
Included: Performance forecasting
Not included: Performance forecasting
Included: Competitor ad tracking
Not included: Competitor ad tracking
Included: Product catalog import
Not included: Product catalog import
Included: One-click ad export
Not included: One-click ad export
Included: Ad copy generation
Not included: Ad copy generation
Included: Campaign-level generation
Not included: Campaign-level generation
Not included: Drag-and-drop editor
Included: Drag-and-drop editor
Not included: General design templates
Included: General design templates
Not included: Video editing
Included: Video editing
Not included: Presentation design
Included: Presentation design
Included: Multi-language ad generation
Not included: Multi-language ad generation

Generating an ad with Lapis

3 steps

  1. Describe your campaign goal and mention your product
  2. Review AI-generated ads, already sized for every platform
  3. Export to ad managers with one click

Generating an ad with Canva

5 steps

  1. Search for an ad template that fits your goal
  2. Customize colors, fonts, images, and copy manually
  3. Duplicate and resize for each platform
  4. Export each size as a separate file
  5. Upload to each ad manager individually

Why teams switch to Lapis

Describe it. Don’t design it.

Skip the blank canvas. Tell Lapis what you’re promoting in plain text, and AI generates complete ad creatives with layout, copy, and imagery. No drag-and-drop required.

Describe it. Don’t design it. feature illustration

Every platform. Every size. Automatically.

In Canva, you resize manually for each platform. Lapis generates ads already optimized for Meta, Google, Reddit, and LinkedIn. One prompt, every format.

Every platform. Every size. Automatically. feature illustration

Know what works before you spend.

Canva can’t tell you if your ad will perform. Lapis forecasts impressions, clicks, and leads before you launch. Make data-driven decisions, not guesses.

Know what works before you spend. feature illustration

Honest take

Get started

Choose Lapis

if you need to...

  • Generate ad campaigns quickly from a text description
  • Create platform-optimized ads without manual resizing
  • Forecast ad performance before spending your budget
  • Track competitor ads and find winning creative angles

Choose Canva

if you need to...

  • Design presentations, resumes, or flyers
  • Create logos or brand kits from scratch
  • Edit videos or build custom graphics from scratch
  • Work with a drag-and-drop editor you already know

Frequently asked questions