Performance Max runs Google. Lapis runs the whole system.
Performance Max automates bidding and placement across Google's inventory. Lapis is the advertiser layer around it: on-brand creative, matched landing pages, and one learning loop across every channel, with you in control.
Lapis creates the on-brand ads and matched pages Performance Max runs on, then keeps one learning loop across Google, Meta, and more, with you in control of brand, budget, and approvals.
Creates the creative and pages the algorithm needs
One learning loop across every channel
You keep control of brand, budget, and approvals
Performance Max
Automation across Google
Performance Max optimizes bidding and placement across Search, YouTube, Display, and more, but you hand creative and budget to a black box, with no landing pages and no view beyond Google.
Optimizes bidding and placement across Google inventory
Creative and budget go into a black box
No landing pages and no cross-channel view
Trusted by Marketing Teams at
The layer Performance Max doesn't give you
Performance Max optimizes delivery across Google. Lapis creates the inputs, adds landing pages, and keeps transparent learning you own across channels.
Creative that feeds the algorithm
Performance Max needs asset groups to run. Lapis generates complete, on-brand ad directions from your brand and product context, ready to feed into Google.
RapidDomain builds a complete, on-brand page matched to each ad and tests full-page variants, covering the part of the funnel Performance Max does not touch.
Every ad is labeled across dimensions like angle, audience, and proof, so your learning is transparent and portable instead of locked inside one platform.
Performance Max and Lapis do different jobs. A lighter check on Lapis means Google owns that job; a lighter check on Performance Max means Google does it inside its own platform.
Lapis
Performance Max
Not included: Automated bidding and placement across Google
Included: Automated bidding and placement across Google
Not included: Real-time in-platform optimization
Included: Real-time in-platform optimization
Not included: Native Google first-party signal
Included: Native Google first-party signal
Included: Generates original on-brand ad creative
Not included: Generates original on-brand ad creative
Included: A matched landing page for every ad
Not included: A matched landing page for every ad
Included: One learning loop across channels
Not included: One learning loop across channels
Included: Works beyond Google (Meta, ChatGPT, and more)
Not included: Works beyond Google (Meta, ChatGPT, and more)
Included: Performance forecasting before you spend
Not included: Performance forecasting before you spend
Included: Audience-specific creative you control
Not included: Audience-specific creative you control
Included: Creative tagged and scored across nine dimensions
Not included: Creative tagged and scored across nine dimensions
Included: Transparent, portable learning you own
Not included: Transparent, portable learning you own
Not included: Fully hands-off single-platform automation
Included: You control brand, budget, and approvals
Included: You control brand, budget, and approvals
Lapis
How Lapis runs alongside it
01Generate on-brand creative and a matched page
02Launch, including through Google
03Compare labeled creative and audience variants
04Carry the learning across every channel
Performance Max
How Performance Max runs
01Pick a goal and set a budget
02Hand asset groups and signals to Google
03The algorithm allocates across inventory
04Read the results Google reports
Why teams run Lapis around platform automation
01
Feed the algorithm better inputs.
Performance Max optimizes whatever asset groups it is given. Lapis makes the on-brand creative and matched pages that give it something better to work with.
02
See across channels, not just Google.
Platform automation optimizes one network. Lapis keeps one view and one learning loop across Google, Meta, and more.
03
Keep the learning you own.
Black-box automation keeps its reasoning inside the platform. Lapis records transparent, portable learning your team controls.
Generate the creative and landing pages automation runs on
Work across more than one platform
Keep transparent, portable learning you own
Stay in control of brand, budget, and strategy
Choose Performance Max
if you need to...
Fully hands-off delivery across Google inventory
Lean on Google's first-party signal and real-time bidding
Automate placements across Google with minimal setup
Optimize a single-network auction directly
Lapis works alongside Performance Max, not instead of it. Google controls bidding, placement, and delivery; Lapis creates the inputs and the cross-channel intelligence around them.
FAQs
No. Performance Max automates bidding, placement, and delivery across Google. Lapis complements it by creating the on-brand creative and matched landing pages it runs on, and by adding cross-channel learning you control.
No. Google controls eligibility, bidding, placement, and delivery. Lapis prepares the creative, pages, experiments, and reporting around the campaign; the platform runs the auction.
Performance Max can auto-generate and combine assets from what you provide. Lapis generates original, on-brand creative from your brand and product context, which you then review before it is used.
Yes. Lapis carries brand context, creative, experiments, and reporting across supported channels including Meta and, on managed plans, ChatGPT, so learning is not locked to one platform.
Yes. RapidDomain builds a complete, on-brand page matched to each ad and tests full-page variants. It runs on a campaign subdomain and does not replace your main website.
You do. You set the goal, budget, and approvals. On managed plans, Lapis can recommend or apply budget changes within agreed guardrails.
No. Forecasts are directional and live results are the source of truth. Lapis improves the inputs and the learning; it does not promise a specific cost or outcome.
Self-serve covers Meta on Basic and adds Google on Pro. Reddit, LinkedIn, and ChatGPT advertising are available through managed plans.